Energy Country Review: Complimentary 7-day trial

  • News-alert sign up
  • Contact us

First Balfour Wins Palayan Binary Geothermal Power Plant Project

19/01/2021

First Balfour has secured the Engineering, Procurement and Construction (EPC) contract for the 23 MW Palayan Binary Plant Balance of Plant (BOP) Works Package. Awarded by Energy Development Corporation (EDC) on 10 November 2020, the new project located in the municipality of Manito in Albay in the Philippines is valued at PhP 1.3 Billion.

The BOP works package contract covers the installation of equipment necessary to generate energy using the residual brine flow from the existing EDC steam field. It includes EPC works for the civil, structural, and electromechanical works to complete the Binary Power Plant. The project is also expected to boost the region’s local economy as 70% of its target total manpower will be sourced from the provinces of Albay and Sorsogon. Upon project completion in 2022, the plant will boost the overall power generation capacity of the existing Bacman Conventional Geothermal Power Plant which currently generates 120 MW equivalent steam capacity.

The 1,200 MW installed capacity of EDC accounts for over 62% of the country’s total geothermal capacity (Image source: EDC)

“It was in 2018 when we first started discussing this prospect with EDC and original equipment manufacturers (OEM). But with the persistence of the tender team and the full support of our management, we were able to win this project despite limitations caused by community quarantine protocols,” shares Business Development Manager Joram San Luis.

The new project will soon be followed by two more related work packages namely the Fluid Collection Reinjection System which will transport the steam from the existing EDC facility to this Binary Plant and the Connection Assets Works Package which will connect the plant to the electricity grid.

KeyFacts Energy: Geothermal news

< Previous Next >