Energy Country Review: Complimentary 7-day trial

  • News-alert sign up
  • Contact us

Empire Commences Carpentaria-2H Hydraulic Stimulation

13/07/2022

Empire Energy today advises that the fracture stimulation of Carpentaria-2H (“C-2H”) has commenced. C-2H is located in Empire’s 100% owned and operated EP187 Beetaloo Sub-basin acreage. The first of 25 planned stages across the horizontal section has been successfully pumped within the Velkerri B Shale.

Empire Energy advises that the fracture stimulation of Carpentaria-2H (“C-2H”) has commenced. C-2H is located in Empire’s 100% owned and operated EP187 Beetaloo Sub-basin acreage. The first of 25 planned stages across the horizontal section has been successfully pumped within the Velkerri B Shale.

As previously announced, the stimulation has been designed to utilise several fluid mixes to assess which design results in the best production performance to enhance Beetaloo specific completion designs. The C-2H well production test will also provide an early production type curve and a better understanding of gas composition for development planning.

A period of flowback of hydraulic stimulation fluids is anticipated prior to gas production as each of the treated stages progressively cleans up. Empire will then undertake an extended production test for up to 90 days. 

Empire remains on track to drill the Carpentaria-4V vertical well in the Carpentaria East area of EP187 and drill, hydraulically stimulate and flow test the Carpentaria-3H horizontal well on the same well pad as Carpentaria-2H later this year. 

Tags:
< Previous Next >