Energy Country Review: Complimentary 7-day trial

  • News-alert sign up
  • Contact us

Nordex to supply VSB Group turbines for wind farm in Poland

24/11/2022

The VSB Group has placed an order with the Nordex Group for the supply and installation of 13 N117/3600 turbines for a wind farm in Poland. The order also includes the Premium Service for the turbines covering a period of 20 years.

The wind farm is being built in the Polish voivodeship of Silesia in the south-west of the country, close to the Czech border. The Nordex Group will supply the N117/3600 turbines on tubular steel towers with hub heights of 134 metres. The turbines will be operated with a rated output of 3.2 MW.

Installation of the turbines is due to begin at the beginning of 2024 with commissioning following in summer 2024.

As early as 2021, the VSB Group placed an order with the Nordex Group to supply turbines for the 42.6 MW Baranów-Rychtal wind farm - the first Polish project to be developed by the international project developer and operator itself. Baranów-Rychtal is currently under construction.

KeyFacts Energy Industry Directory: Nordex   l   VSB Group   l   KeyFacts Energy news: Contract Awards

Tags:
< Previous Next >