Energy Country Review: Complimentary 7-day trial

  • News-alert sign up
  • Contact us

Trillion Energy commences SASB 3D seismic reprocessing project

31/01/2023

Trillion Energy International today announced the commencement of it’s 3D seismic reprocessing project for SASB in Turkey. 

The existing 3D seismic data covers 223 km² and includes the SASB block. This old 3D seismic shot by WesternGeco in 2004 is good quality and was processed in 2004 with pre-stack time migration (PSTM). Since 2004, vast improvements in seismic data processing algorithms have occurred. As SASB has very complex geology, reprocessing with advanced pre-stack depth migration (PSDM) and incorporating time-depth data from wells drilled since the old PSTM model was created will create a superior model.   

Uses of the new PSDM seismic velocity model will include: 

  • Obtain a more detailed and accurate mapping of individual gas reservoir units, provide better imaging of the gas trapping faults and superior structural maps; 
  • Further, identify and define stratigraphic exploration gas prospects (to which there are many on SASB) but which have never been drilled; 
  • Mapping the deeper Cretaceous Akveren Formation “CAF”, which has never been explored, but which contains tantalizing deeper anomalies based on the old PSTM model. Onshore proximate to SASB, there are many oil and gas seeps originating and contained within the Cretaceous sediments. The data reprocessing is scheduled to commence early March 2023 and is anticipated to take five to six months to complete. 

Arthur Halleran, CEO of Trillion, stated:
“Reprocessing the 3D seismic data using modern cutting-edge technology will increase our understanding of the gas potential at SASB and is the first step to making significant new discoveries. The cost of reprocessing is infinitesimal compared a new 3D shoot of this size. The reprocessing will allow mapping of extensions to existing structurally trapped gas pools, discover new gas pools and improve resolution of the stratigraphic exploration prospects. I am  excited about what we will also see in the deeper Cretaceous age formations, where onshore oil and gas seeps have been found 20 to 30 km from SASB.”

Black Sea Natural Gas Project – South Akcakoca Sub-Basin Gas Field (SASB)

  • SASB is the Black Sea’s first commercial natural gas development project
  • Phases I & II of the SASB Project were developed between 2008 – 2012 at a total cost of US $608m which was invested by the project partners at the time
  • Trillion Energy’s 100% owned subsidiary, Park Place Energy Turkey Limited “PPETL” invested approximately US $180m for a 36.75% interest in the SASB Project to 2013.

KeyFacts Energy: Trillion Turkey country profile 

Tags:
< Previous Next >