Energy Country Review: Complimentary 7-day trial

  • News-alert sign up
  • Contact us

Melbana's Amistad-2 Production Well Commences Drilling

19/09/2025

Melbana Energy advises that drilling of the Amistad-2 production well commenced in the early hours of Thursday, 18 September 2025 (Cuba time).

Amistad-2 is planned to be drilled to a total depth of 1125 metres measured depth (MD). The Unit 1A formation will be logged, but not tested, en route. A 650-metre MD section of the Unit 1B formation will be drilled to intersect a series of natural fracture systems interpreted from seismic (see Figure 1).  The geological target is approximately 850 metres southwest of, and 200 metres up-dip to, Alameda-2 in a location near the crestal-axis of a localised anticline, which is interpreted to have significant fracturing of the carbonate reservoir. 

Figure 1 - Amistad-2 well trajectory oriented to intercept fractures and penetrate all of Unit 1B

KeyFacts Energy: Melbana Energy Cuba country profile

Tags:
< Previous Next >