Petro Matad Limited, the AIM quoted Mongolian oil explorer, announces the commencement of testing operations at the Heron-1 well in the north of Block XX, eastern Mongolia.
Map source: KeyFacts Energy
The DQE Testing Rig #1 has been mobilised from Block XIX to the Heron-1 location and rigged up, and testing operations have now commenced. If required, reservoir stimulation equipment is in Block XIX and is readily available. The testing operations on Heron-1 are expected to be completed during October.
At the nearby Gazelle-1 well, drilling with the DQE International Rig #40105 is progressing on schedule.