Energean Oil and Gas announces successful results from production measurement performed during clean-up of the Karish Main-02 development well, which is located on the crest of the Karish Main structure.
KM-02 produced from a 35 meter interval of the C sand reservoir. The well flowed at a maximum rate of 120 million standard cubic feet per day (Mmscf/d) of natural gas, limited only by the capacity of the surface equipment. Performance modelling confirms that the well is capable of delivering at the 300 Mmscf/d design capacity when connected to the FPSO.
Link to Energean Israel country profile