Energy Country Review: Complimentary 7-day trial

  • News-alert sign up
  • Contact us

ANDRITZ HYDRO

Contacts

ANDRITZ HYDRO Hammerfest (UK) Limited
Innovation Centre
1 Ainslie Road
Hillington Park
Glasgow, G52 4RU
Scotland

Tel: 0141 585 6447

Description

ANDRITZ HYDRO Hammerfest delivers tidal turbine arrays and services to harness the great energy potential from tidal streams. The modular solutions are designed to allow optimal integration in the daily operation plans of the customers, supporting the worldwide energy mix.

The Company was established in 1997 in Hammerfest, Norway. Due to the promising market potential offered by the UK an office was opened in Glasgow in 2008. Today, ANDRITZ HYDRO Hammerfest is  part of the ANDRITZ HYDRO GmbH group, a global supplier of electro-mechanical equipment and services for the hydropower business.

In December 2011, ANDRITZ HYDRO Hammerfest successfully deployed its 1 megawatt (MW) pre-commercial tidal turbine at EMEC’s tidal test site. The device delivered its first energy to the grid in February 2012.

The HS1000 turbine is based on the technology of a smaller turbine, the HS300, which was installed in Norway as the first ever tidal current turbine with permanent connection to the public grid in 2004. The prototype has been in operation for more than 17,000 hours, delivering over 1.5 GWh to the grid and showed 98% availability during testing.

Based on the learning gained during its testing period at EMEC, ANDRITZ HYDRO Hammerfest has developed 1.5MW turbines, three of which have been installed as part of the MeyGen project in the Pentland Firth.

Website